Lease from $1,500 a month ≈ 12 hours saved a month
Every pour waits on its report and its certificate, and the file is kept by hand.
- Threshold inspections
- Pour by pour
- The inspector judges
Lease this agent Book a meeting
Estimate for a high-rise project under construction
Agent identity cardFront
- Agent name
- STRELITZIA
- Role
- Legal and compliance
- Industry
- Construction
- Country
- United States
- Built by
- Rodium, Paris
No. AGT-032-JUR · Rodium agent library
Skills
- Pours
- Shoring
- Final file
Authorizations
- GatherAllowed
- ReconcileAllowed
- FlagAllowed
- DecideReserved for your team
- Close outReserved for your team
Motto I prepare, you decide.
Agent identity cardBack
What Strelitzia will never do
- Judge the quality of the work or the content of a sealed report
- Authorize, stop or reschedule a pour
- Certify shoring or sign a document on the contractor's behalf
- Write to the inspector or the building department without review
Who does what
- Gather
- Strelitzia
- Reconcile
- Strelitzia
- Flag
- Strelitzia
- Decide
- Your team
- Close out
- Your team
Strelitzia in four numbers
≈ 12 h
hours saved a month
Estimate for a high-rise project under construction
2 of 5
steps stay with you
Decide · Close out
5
sources read for you
Inspection plan · Sealed reports · Shoring certificates · Pour schedule · Email and platform
$1,500
a month, leased over 24 months
The flow
What Strelitzia reads, and what comes out
Your sources
- Inspection planapproved with the permit
- Sealed reportsfrom the special inspector
- Shoring certificatesshoring and reshoring
- Pour scheduleslabs, columns, shear walls
- Email and platformdocuments received, correspondence
Strelitziamatching, checking, follow-upWhat comes out
- Dashboardpour by pour
- Missing documentsbefore the next pour
- Follow-upsdrafted, sent by you
- Inconsistenciesdate, seal, level
- Final fileready for the inspector's final certification
The inspector judges, your team decides.
The problem
The file grows with the tower
In Florida, a building above a height threshold, or a large assembly occupancy, is a “threshold building”: it follows a structural inspection plan approved with the permit. A special inspector checks each stage, and the contractor certifies each shoring installation. A missing document often goes unnoticed on the day of the pour, and resurfaces at the certificate of occupancy.
One report per stage.
The inspection plan sets the list
Rebar, post-tensioning, shoring: the plan says what must be inspected, and when. Each stage waits for its sealed report.
Shoring, then reshoring.
Every shoring stage gets certified
Every shoring installation must be certified by the contractor as compliant with the shoring plans. These certificates come on top of the inspector's reports.
In an email, in a binder.
The documents are scattered
Reports arrive by email, certificates from the jobsite. The file often gets pieced back together at the end.
Before the certificate of occupancy.
Gaps show up late
At the end of the project, the inspector files a signed and sealed final certification. One report that can't be found holds everyone up.
TodayBy hand
- You file the reports received by email in a shared folder.
- You check off the inspection plan by hand, when you have time.
- You hunt for the shoring certificate on the jobsite.
- A missing document carries over from one pour to the next.
- The file gets pieced together before the certificate of occupancy.
With StrelitziaThe decision stays yours
- Every report is read and tied to its stage as soon as it arrives.
- The inspection plan is tracked line by line, continuously.
- Every shoring stage calls for its certificate, level by level.
- A missing document is flagged before the next pour.
- The file is complete as the project goes, not at the end.
How it works
The file in five steps, two of them yours
Gather, match and flag: Strelitzia. The inspector judges the work, and your team decides what comes next.
- 01Strelitzia
Gather
Strelitzia collects reports and certificates where they arrive: email, project platform, jobsite scans.
- 02Strelitzia
Reconcile
Each document is tied to its stage in the inspection plan: level, element, date. The technical content remains the inspector's.
- 03Strelitzia
Flag
Before every pour and every shoring stage, the list of missing or inconsistent documents is ready, with the follow-up drafted.
- 04Your team
Decide
Your superintendent chooses what's next: follow up, wait or reschedule. Strelitzia neither authorizes nor stops any pour.
- 05Your team
Close out
When the structure is complete, your team reviews the full file and makes it available to the inspector for the final certification.
What Strelitzia connects to
- Project platforms
- Procore
- Autodesk Construction Cloud
- Oracle Aconex
- Scheduling
- Oracle Primavera
- Microsoft Project
- Excel
- Documents and email
- Microsoft 365
- Outlook
- SharePoint
- Google Workspace
- PDFs and scans
The workstreams
Three uses, a file always up to date
The same foundation serves all three: a document is read only once, then tied to its stage.
Pours
Every pour in the plan is tracked: inspection requested, report received, report sealed. The dashboard shows what's missing before the next one.
In practice: The rebar report for a slab isn't on file, while the next floor's pour is coming up. Strelitzia flags it to the superintendent, with the follow-up ready for the inspector.
Shoring
Every shoring and reshoring stage calls for its certificate, level by level. Each certificate is tied to the shoring plan on file.
In practice: Shores on one level are scheduled to come out tomorrow, but the reshoring certificate for the level below is missing. Strelitzia puts it at the top of the list.
Final file
The file is kept complete as the project goes. Before the certificate of occupancy, it only needs a final review.
In practice: The inspector is preparing the final certification. The file is ready, organized by level, each report with its date and seal, with no last-minute search.
The ground rules
A copilot, not an autopilot
What Strelitzia will never do
- Judge the quality of the work or the content of a sealed report.
- Authorize, stop or reschedule a pour.
- Certify shoring or sign a document on the contractor's behalf.
- Write to the inspector or the building department without review.
- Treat a document as received without the document itself.
The limits: Strelitzia writes nothing to your project platform without approval, and sends no follow-up without review.
What's always true
- Hosted in the US
- Your project documents stay in a US region of the cloud provider you choose, or in your own account.
- Mistral by default
- The default model is Mistral, deployed in the same region, and your documents are never used to train a third-party model.
- The source document
- Each line of the dashboard points to the report or certificate itself, so you can check without searching.
- Traceability
- Every document received, every follow-up and every approval is logged, with its date.
What it costs
Lease Strelitzia, or buy it
Lease Strelitzia
from $1,500 a month
- Setup
- $7,500 to $22,500 2 to 4 weeks with a first tool connected: the agent is configured on your documents, your rules and that tool, then tested with your team. Each additional tool adds one to two weeks.
- Monthly fee
- $1,500 to $4,500 a month Depending on the volume handled and the number of tools connected. For multiple locations or companies, the amount is set in the quote after our first meeting. 24-month commitment, then one month's notice.
Hosting, supervision, updates and adjustments included.
Or buy it, fully custom
- Scoping
- $2,500 to $6,000 1 to 2 weeks, on your real documents: what the agent will do, the hours it will save you, the quote for the pilot.
- Pilot
- $12,000 to $30,000 6 to 10 weeks, on one task and one team or site. The time saved is measured, and you can stop at the end.
- Rollout
- $25,000 to $70,000 Depending on the number of sites and software tools to connect.
- Running the agent
- $500 to $2,500 a month Hosting, model, monitoring and small improvements.
Indicative ranges in US dollars, for clients in the United States: a senior team with Paris-based pricing. The price is fixed in a quote after our first meeting or the scoping phase; clients in Europe are quoted in euros.
How we start
- 01
One hour
Together, we look at your inspection plan and a few reports, with no commitment.
- 02
A completed tower
Strelitzia works on the file of a tower already delivered, to see what the agent catches and what it misses.
- 03
One connector
One to two weeks to connect to your project platform, read-only.
- 04
A live project
On the next tower, your team keeps the file as usual and compares, then you decide.
FAQ
What people ask us first
How long does it take to set up Strelitzia?
One hour to look at your inspection plan and a few reports, then the file of a tower already delivered to compare with your team. The connector to your project platform takes one to two weeks to set up, read-only. Strelitzia then tracks your live project, alongside your team, and you decide.
What is a threshold building?
It's a category under Florida law: a building above a height threshold, or a large assembly occupancy. It follows a structural inspection plan approved with the permit. A special inspector, a licensed engineer or architect, carries it out.
Does Strelitzia replace the special inspector?
No. The inspector judges the work and seals the reports. Strelitzia only checks that every expected report and certificate is on file, on time. The agent never rereads a report to second-guess it.
Can Strelitzia stop a concrete pour?
No. Strelitzia flags a missing document before the pour. The decision to pour, wait or reschedule stays on the jobsite.
What happens at the certificate of occupancy?
The certificate of occupancy is the authorization to occupy the building, issued by the city or county. Before it, the special inspector files a signed and sealed final certification. With Strelitzia, the file behind it is complete as the project goes.
Where are our documents hosted?
In a US region of the cloud provider you choose, or in your own account. The default model is Mistral, deployed in the same region. Your documents are never used to train a third-party model.
How much time does Strelitzia save?
We estimate 12 hours a month, for a high-rise project under construction. This is Rodium's estimate, based on the time keeping this file takes in the industry. The tower already delivered measures yours.
You're in Paris: how do we work together?
Directly with our developers, in English, with no middlemen. Our afternoons in Paris are your mornings in Florida: video calls are scheduled in that shared window. The contract is drafted in English or French.