Explore in 3D Start a projectGet started

AI agent: Legal and compliance

Strelitzia

An agent for general contractors building high-rises in Florida. At every pour and every shoring stage, Strelitzia checks that the expected inspector's report and certificate are on file; the inspector judges the work, your team decides.

Lease from $1,500 a month ≈ 12 hours saved a month

Every pour waits on its report and its certificate, and the file is kept by hand.

  • Threshold inspections
  • Pour by pour
  • The inspector judges

Lease this agent Book a meeting

Estimate for a high-rise project under construction

Agent identity cardFront

Portrait of Strelitzia
Agent name
STRELITZIA
Role
Legal and compliance
Industry
Construction
Country
United States
Built by
Rodium, Paris

No. AGT-032-JUR · Rodium agent library

Skills

  • Pours
  • Shoring
  • Final file

Authorizations

  • GatherAllowed
  • ReconcileAllowed
  • FlagAllowed
  • DecideReserved for your team
  • Close outReserved for your team

Motto I prepare, you decide.

Agent identity cardBack

What Strelitzia will never do

  • Judge the quality of the work or the content of a sealed report
  • Authorize, stop or reschedule a pour
  • Certify shoring or sign a document on the contractor's behalf
  • Write to the inspector or the building department without review

Who does what

Gather
Strelitzia
Reconcile
Strelitzia
Flag
Strelitzia
Decide
Your team
Close out
Your team

Strelitzia in four numbers

≈ 12 h

hours saved a month

Estimate for a high-rise project under construction

2 of 5

steps stay with you

Decide · Close out

5

sources read for you

Inspection plan · Sealed reports · Shoring certificates · Pour schedule · Email and platform

$1,500

a month, leased over 24 months

The flow

What Strelitzia reads, and what comes out

Your sources

  • Inspection planapproved with the permit
  • Sealed reportsfrom the special inspector
  • Shoring certificatesshoring and reshoring
  • Pour scheduleslabs, columns, shear walls
  • Email and platformdocuments received, correspondence
Strelitziamatching, checking, follow-up

What comes out

  • Dashboardpour by pour
  • Missing documentsbefore the next pour
  • Follow-upsdrafted, sent by you
  • Inconsistenciesdate, seal, level
  • Final fileready for the inspector's final certification

The inspector judges, your team decides.

The problem

The file grows with the tower

In Florida, a building above a height threshold, or a large assembly occupancy, is a “threshold building”: it follows a structural inspection plan approved with the permit. A special inspector checks each stage, and the contractor certifies each shoring installation. A missing document often goes unnoticed on the day of the pour, and resurfaces at the certificate of occupancy.

  • One report per stage.

    The inspection plan sets the list

    Rebar, post-tensioning, shoring: the plan says what must be inspected, and when. Each stage waits for its sealed report.

  • Shoring, then reshoring.

    Every shoring stage gets certified

    Every shoring installation must be certified by the contractor as compliant with the shoring plans. These certificates come on top of the inspector's reports.

  • In an email, in a binder.

    The documents are scattered

    Reports arrive by email, certificates from the jobsite. The file often gets pieced back together at the end.

  • Before the certificate of occupancy.

    Gaps show up late

    At the end of the project, the inspector files a signed and sealed final certification. One report that can't be found holds everyone up.

TodayBy hand

  1. You file the reports received by email in a shared folder.
  2. You check off the inspection plan by hand, when you have time.
  3. You hunt for the shoring certificate on the jobsite.
  4. A missing document carries over from one pour to the next.
  5. The file gets pieced together before the certificate of occupancy.

With StrelitziaThe decision stays yours

  1. Every report is read and tied to its stage as soon as it arrives.
  2. The inspection plan is tracked line by line, continuously.
  3. Every shoring stage calls for its certificate, level by level.
  4. A missing document is flagged before the next pour.
  5. The file is complete as the project goes, not at the end.

How it works

The file in five steps, two of them yours

Gather, match and flag: Strelitzia. The inspector judges the work, and your team decides what comes next.

  1. 01Strelitzia

    Gather

    Strelitzia collects reports and certificates where they arrive: email, project platform, jobsite scans.

  2. 02Strelitzia

    Reconcile

    Each document is tied to its stage in the inspection plan: level, element, date. The technical content remains the inspector's.

  3. 03Strelitzia

    Flag

    Before every pour and every shoring stage, the list of missing or inconsistent documents is ready, with the follow-up drafted.

  4. 04Your team

    Decide

    Your superintendent chooses what's next: follow up, wait or reschedule. Strelitzia neither authorizes nor stops any pour.

  5. 05Your team

    Close out

    When the structure is complete, your team reviews the full file and makes it available to the inspector for the final certification.

What Strelitzia connects to

Project platforms
  • Procore
  • Autodesk Construction Cloud
  • Oracle Aconex
Scheduling
  • Oracle Primavera
  • Microsoft Project
  • Excel
Documents and email
  • Microsoft 365
  • Outlook
  • SharePoint
  • Google Workspace
  • PDFs and scans

The workstreams

Three uses, a file always up to date

The same foundation serves all three: a document is read only once, then tied to its stage.

  • Pours

    Every pour in the plan is tracked: inspection requested, report received, report sealed. The dashboard shows what's missing before the next one.

    In practice: The rebar report for a slab isn't on file, while the next floor's pour is coming up. Strelitzia flags it to the superintendent, with the follow-up ready for the inspector.

  • Shoring

    Every shoring and reshoring stage calls for its certificate, level by level. Each certificate is tied to the shoring plan on file.

    In practice: Shores on one level are scheduled to come out tomorrow, but the reshoring certificate for the level below is missing. Strelitzia puts it at the top of the list.

  • Final file

    The file is kept complete as the project goes. Before the certificate of occupancy, it only needs a final review.

    In practice: The inspector is preparing the final certification. The file is ready, organized by level, each report with its date and seal, with no last-minute search.

The ground rules

A copilot, not an autopilot

What Strelitzia will never do

  • Judge the quality of the work or the content of a sealed report.
  • Authorize, stop or reschedule a pour.
  • Certify shoring or sign a document on the contractor's behalf.
  • Write to the inspector or the building department without review.
  • Treat a document as received without the document itself.

The limits: Strelitzia writes nothing to your project platform without approval, and sends no follow-up without review.

What's always true

Hosted in the US
Your project documents stay in a US region of the cloud provider you choose, or in your own account.
Mistral by default
The default model is Mistral, deployed in the same region, and your documents are never used to train a third-party model.
The source document
Each line of the dashboard points to the report or certificate itself, so you can check without searching.
Traceability
Every document received, every follow-up and every approval is logged, with its date.

What it costs

Lease Strelitzia, or buy it

Lease Strelitzia

from $1,500 a month

Setup
$7,500 to $22,500 2 to 4 weeks with a first tool connected: the agent is configured on your documents, your rules and that tool, then tested with your team. Each additional tool adds one to two weeks.
Monthly fee
$1,500 to $4,500 a month Depending on the volume handled and the number of tools connected. For multiple locations or companies, the amount is set in the quote after our first meeting. 24-month commitment, then one month's notice.

Hosting, supervision, updates and adjustments included.

Lease this agent

Or buy it, fully custom

Scoping
$2,500 to $6,000 1 to 2 weeks, on your real documents: what the agent will do, the hours it will save you, the quote for the pilot.
Pilot
$12,000 to $30,000 6 to 10 weeks, on one task and one team or site. The time saved is measured, and you can stop at the end.
Rollout
$25,000 to $70,000 Depending on the number of sites and software tools to connect.
Running the agent
$500 to $2,500 a month Hosting, model, monitoring and small improvements.

Indicative ranges in US dollars, for clients in the United States: a senior team with Paris-based pricing. The price is fixed in a quote after our first meeting or the scoping phase; clients in Europe are quoted in euros.

How we start

  1. 01

    One hour

    Together, we look at your inspection plan and a few reports, with no commitment.

  2. 02

    A completed tower

    Strelitzia works on the file of a tower already delivered, to see what the agent catches and what it misses.

  3. 03

    One connector

    One to two weeks to connect to your project platform, read-only.

  4. 04

    A live project

    On the next tower, your team keeps the file as usual and compares, then you decide.

FAQ

What people ask us first

How long does it take to set up Strelitzia?

One hour to look at your inspection plan and a few reports, then the file of a tower already delivered to compare with your team. The connector to your project platform takes one to two weeks to set up, read-only. Strelitzia then tracks your live project, alongside your team, and you decide.

What is a threshold building?

It's a category under Florida law: a building above a height threshold, or a large assembly occupancy. It follows a structural inspection plan approved with the permit. A special inspector, a licensed engineer or architect, carries it out.

Does Strelitzia replace the special inspector?

No. The inspector judges the work and seals the reports. Strelitzia only checks that every expected report and certificate is on file, on time. The agent never rereads a report to second-guess it.

Can Strelitzia stop a concrete pour?

No. Strelitzia flags a missing document before the pour. The decision to pour, wait or reschedule stays on the jobsite.

What happens at the certificate of occupancy?

The certificate of occupancy is the authorization to occupy the building, issued by the city or county. Before it, the special inspector files a signed and sealed final certification. With Strelitzia, the file behind it is complete as the project goes.

Where are our documents hosted?

In a US region of the cloud provider you choose, or in your own account. The default model is Mistral, deployed in the same region. Your documents are never used to train a third-party model.

How much time does Strelitzia save?

We estimate 12 hours a month, for a high-rise project under construction. This is Rodium's estimate, based on the time keeping this file takes in the industry. The tower already delivered measures yours.

You're in Paris: how do we work together?

Directly with our developers, in English, with no middlemen. Our afternoons in Paris are your mornings in Florida: video calls are scheduled in that shared window. The contract is drafted in English or French.