Lease from $1,500 a month ≈ 20 hours saved a month
The building department sends back its comments, and every response means hunting sheet by sheet.
- Plan review
- Comment by comment
- The architect signs
Lease this agent Book a meeting
Estimate for 4 rounds of permit review comments a month
Agent identity cardFront
- Agent name
- LANTANA
- Role
- Legal and compliance
- Industry
- Construction
- Country
- United States
- Built by
- Rodium, Paris
No. AGT-027-JUR · Rodium agent library
Skills
- Response matrix
- Pre-submission check
- Cycle tracking
Authorizations
- ReadAllowed
- LinkAllowed
- DraftAllowed
- DecideReserved for your team
- Sign and submitReserved for your team
Motto I prepare, you decide.
Agent identity cardBack
What Lantana will never do
- Interpret the code for you: compliance is the architect's responsibility
- Change the drawings: corrections stay with your team
- Sign or seal a document: only a licensed professional can take that responsibility
- Submit a set or a response on the city's portal
Who does what
- Read
- Lantana
- Link
- Lantana
- Draft
- Lantana
- Decide
- Your team
- Sign and submit
- Your team
Lantana in four numbers
≈ 20 h
hours saved a month
Estimate for 4 rounds of permit review comments a month
2 of 5
steps stay with you
Decide · Sign and submit
5
sources read for you
Comment letter · Submission portal · Revised drawings · Sheet index · Previous cycles
$1,500
a month, leased over 24 months
The flow
What Lantana reads, and what comes out
Your sources
- Comment letterby discipline, numbered
- Submission portalreviewer markups
- Revised drawingsrevision clouds and deltas
- Sheet indexnumbers, titles, dates
- Previous cyclesresponses already submitted
Lantanareading, matching, draftingWhat comes out
- Response matrixone line per comment
- Referencessheet, detail, revision
- Open questionscomment with no matching change
- Points to decidefor the architect or the engineer
- Historycycle by cycle
Nothing is submitted without the architect's signature.
The problem
The work between two submissions
Plan review is done discipline by discipline, and each reviewer issues comments. The team corrects the drawings, then responds to each comment, citing the revised sheet and detail. Miss one response, and the set goes around for another cycle.
Building, structural, fire, accessibility.
Comments come in scattered
Each reviewer writes their own way, in a PDF or in the portal. First, everything has to be pulled into a single list.
Which sheet, which detail?
References are tracked down by hand
For each comment, someone has to find the revised sheet, the detail and the revision number. Yet the drawings are already corrected.
All addressed, except one.
One miss costs a cycle
A response is missing, or points to the wrong sheet. The same comment comes back in the next cycle.
From one cycle to the next.
The history gets lost
Last time's responses are hard to find. You reread everything so as not to contradict yourself.
TodayBy hand
- You copy the comments from the PDF into a table.
- You look for the revised sheet for each one.
- You draft the response starting from the previous set.
- A comment with no correction goes unnoticed.
- The cycle history sits buried in email.
With LantanaThe signature stays yours
- Comments are gathered into a single numbered list.
- Each is linked to its sheet, detail and revision.
- The response line is drafted, ready for you to review.
- A comment with no matching change is flagged before resubmittal.
- Each cycle keeps its responses, close at hand.
How it works
A round of review comments in five steps, two of them yours
Read, link and draft: Lantana. Decide, sign and submit: the architect, who alone is responsible for the set.
- 01Lantana
Read
Lantana reads the comment letter or the portal export, and splits it into numbered comments. Each keeps its discipline and the code section cited.
- 02Lantana
Link
Each comment is matched to the revised sheets: cloud, revision, detail. A comment with no visible change is marked.
- 03Lantana
Draft
A response line is proposed for each, with the exact reference. The tone follows that of your past responses.
- 04Your team
Decide
The architect, or the engineer for that discipline, reviews the responses and the open points. They alone decide what meets the code.
- 05Your team
Sign and submit
The approved matrix goes out with the revised drawings, under your signature. Lantana submits nothing.
What Lantana connects to
- Submission portals
- ProjectDox
- Accela
- EnerGov
- Bluebeam Studio Sessions
- Drawings and markups
- Bluebeam Revu
- Adobe Acrobat
- Autodesk Revit
- AutoCAD
- Archicad
- Projects and documents
- Autodesk Construction Cloud
- Newforma
- Procore
- Microsoft 365
- Google Workspace
The workstreams
Three uses, one permit set
The same foundation serves all three: a comment is read only once, then tracked until it is closed.
Response matrix
Each comment gets its line: response, sheet, detail, revision. The matrix follows the format the city expects.
In practice: A firm receives plan review comments on an office building, across several disciplines. Lantana proposes the complete matrix, and the architect only has to review and correct it.
Pre-submission check
Comments with no response or no matching change are listed before resubmittal. So are references to a sheet missing from the set.
In practice: A comment concerns a guardrail height, but no cloud appears in the revised set. Lantana flags it as an open question instead of writing “corrected.”
Cycle tracking
Each cycle keeps its comments and responses. A comment that comes back is recognized, with the response already given.
In practice: In the next cycle, the reviewer rephrases a comment about means of egress. Lantana finds the previous response and the sheet cited at the time.
The ground rules
A copilot, not an autopilot
What Lantana will never do
- Sign or seal a document: only a licensed professional can take that responsibility.
- Submit a set or a response on the city's portal.
- Write “corrected” with no visible change on a sheet.
- Settle a code interpretation question, or request a variance.
- Contact the reviewer or the owner on your behalf.
- Interpret the code for you: compliance is the architect's responsibility.
- Change the drawings: corrections stay with your team.
The limits: Lantana doesn't change any drawing and doesn't upload anything to a portal.
What's always true
- Hosted in the US
- Your drawings and your correspondence with the city stay in a US region of the cloud provider you choose, or in your own account.
- Mistral by default
- The default model is Mistral, deployed in the same region, and your documents are never used to train a third-party model.
- Every reference verifiable
- Each response cites the sheet, the detail and the revision, so the architect can check the drawing without searching.
- Traceability
- Every proposal, correction and approval is logged, with who did it and when.
What it costs
Lease Lantana, or buy it
Lease Lantana
from $1,500 a month
- Setup
- $7,500 to $22,500 2 to 4 weeks with a first tool connected: the agent is configured on your documents, your rules and that tool, then tested with your team. Each additional tool adds one to two weeks.
- Monthly fee
- $1,500 to $4,500 a month Depending on the volume handled and the number of tools connected. For multiple locations or companies, the amount is set in the quote after our first meeting. 24-month commitment, then one month's notice.
Hosting, supervision, updates and adjustments included.
Or buy it, fully custom
- Scoping
- $2,500 to $6,000 1 to 2 weeks, on your real documents: what the agent will do, the hours it will save you, the quote for the pilot.
- Pilot
- $12,000 to $30,000 6 to 10 weeks, on one task and one team or site. The time saved is measured, and you can stop at the end.
- Rollout
- $25,000 to $70,000 Depending on the number of sites and software tools to connect.
- Running the agent
- $500 to $2,500 a month Hosting, model, monitoring and small improvements.
Indicative ranges in US dollars, for clients in the United States: a senior team with Paris-based pricing. The price is fixed in a quote after our first meeting or the scoping phase; clients in Europe are quoted in euros.
How we start
- 01
One hour
Together, we look at a recent round of review comments and how you respond, with no commitment.
- 02
A permit already issued
Lantana works on a closed project, then you compare her responses with the ones your team submitted.
- 03
One connector
One to two weeks to read your portal and your drawings, read-only.
- 04
A permit in progress
At the next round of comments, your team responds as usual and compares, then you decide.
FAQ
What people ask us first
How long does it take to set up Lantana?
One hour to look at a recent round of review comments, then a permit already issued to compare with your team's responses. The connector to your portal and your drawings takes one to two weeks to set up, read-only. The trial in parallel then runs on your next round of comments, and you decide.
Does Lantana check our drawings for code compliance?
No. Compliance remains the job of the architect and the building department. Lantana only prepares the response to the comments received: linking, drafting, flagging, without judging a drawing.
Who signs the response?
The architect, or the engineer for the discipline involved. Lantana signs nothing, seals nothing and submits nothing. The response goes out under your name, after your review.
How does Lantana know which sheet changed?
Lantana reads the revision clouds, the circled areas on the sheet, along with the revision deltas, the sheet index and the revision log. When a change isn't visible, the question is put to you, with no assumption.
Do we need to change our software or portal?
No. Lantana reads what you already receive: the comment letter, the portal export, the PDF drawing set. You keep your design tools and your submission process.
Where are our drawings hosted?
In a US region of the cloud provider you choose, or in your own account. The default model is Mistral, deployed in the same region. Your documents are never used to train a third-party model.
How much time does Lantana save?
We estimate 20 hours a month, for 4 rounds of permit review comments a month. This is Rodium's estimate, based on the time these responses take in the industry. The permit already issued measures yours.
You're in Paris: how do we work together?
Directly with our developers, in English, with no middlemen. Our afternoons in Paris are your mornings on the East Coast: video calls are scheduled in that shared window. The contract is drafted in English or French.