Lease from $1,500 a month ≈ 25 hours saved a month
Every window has its design pressure, and its approval gets checked line by line.
- Product approvals
- Opening by opening
- The engineer decides
Lease this agent Book a meeting
Estimate for 2 projects in the submittal phase
Agent identity cardFront
- Agent name
- HIBISCUS
- Role
- Legal and compliance
- Industry
- Construction
- Country
- United States
- Built by
- Rodium, Paris
No. AGT-028-JUR · Rodium agent library
Skills
- Windows and doors
- Roofing
- Validity
Authorizations
- ReadAllowed
- CollectAllowed
- CompareAllowed
- DecideReserved for your team
- AnswerReserved for your team
Motto I prepare, you decide.
Agent identity cardBack
What Hibiscus will never do
- Calculate wind pressures: that's the structural engineer's job
- Approve or reject a submittal: the review commits your team and the engineer
- Compare pressures by guesswork: the comparison is done by calculation
- Assume an approval covers a product: without the right configuration, it's a question
Who does what
- Read
- Hibiscus
- Collect
- Hibiscus
- Compare
- Hibiscus
- Decide
- Your team
- Answer
- Your team
Hibiscus in four numbers
≈ 25 h
hours saved a month
Estimate for 2 projects in the submittal phase
2 of 5
steps stay with you
Decide · Answer
5
sources read for you
Submittals · NOA approvals · State approvals · Pressure table · Window and door schedule
$1,500
a month, leased over 24 months
The flow
What Hibiscus reads, and what comes out
Your sources
- Submittalsproduct data, shop drawings, anchorage
- NOA approvalslimits, pressures, validity
- State approvalsnumbers and conditions of use
- Pressure tableengineer's design, by opening
- Window and door schedulemarks, sizes, levels
Hibiscusreading, comparing, flaggingWhat comes out
- Review gridone line per opening
- Discrepanciespressure, size, impact
- Validityapproval expired or superseded
- Referencespage and table of the approval
- Questionsto ask the supplier
Your team decides on every discrepancy.
The problem
Pressures to cross-check, page by page
In Florida, the High-Velocity Hurricane Zone (HVHZ) covers Miami-Dade and Broward counties. Every exterior window and door there must be covered by a product approval: a Miami-Dade County NOA (Notice of Acceptance), or a state approval valid in that zone. The submittal the supplier sends before fabrication cites it: what remains is to check that every opening is actually covered.
Tables, notes, cross-references.
The approval is a dense document
Size limits, pressures by configuration, glazing, anchorage: it's all there, across many pages. You have to find the right line for each opening.
Required pressure, rated pressure.
Two tables to reconcile
The engineer gives the design pressure for each opening, the approval gives what the product can withstand. The comparison is done by hand.
The number is there.
The reference isn't enough
An approval may have expired, or may not cover the series submitted. The number alone proves nothing.
After fabrication.
Discrepancies show up late
A window rejected at inspection is a window to redo. Checking costs less before the order.
TodayBy hand
- You open the approval and hunt for the right configuration.
- You copy the rated pressures into a spreadsheet.
- You compare them by hand with the engineer's design.
- You check the approval's validity, when you think of it.
- The discrepancy turns up at inspection, after fabrication.
With HibiscusThe call stays yours
- The configuration is located in the approval, with the page cited.
- Rated pressures are captured once, then reused.
- The comparison is done by calculation, opening by opening.
- Validity is checked on every submittal.
- Any discrepancy is flagged to your team before the order.
How it works
A product submittal in five steps, two of them yours
Read, collect and compare: Hibiscus. Decide and answer the supplier: your team and the engineer.
- 01Hibiscus
Read
Hibiscus reads the submittal and the approval it cites: series, configuration, glazing, anchorage, expiration date.
- 02Hibiscus
Collect
Rated pressures and size limits are pulled from the approval, with their page. The engineer's table is read opening by opening.
- 03Hibiscus
Compare
The comparison is done by calculation, never by AI. Each opening comes out as compliant, a discrepancy or a question.
- 04Your team
Decide
Your engineer reviews the discrepancies and questions. They accept, ask for another configuration or reject.
- 05Your team
Answer
Your team returns its review to the supplier, in your project platform. Hibiscus sends nothing.
What Hibiscus connects to
- Project platforms
- Procore
- Autodesk Construction Cloud
- Oracle Aconex
- Newforma
- Drawings and spreadsheets
- Bluebeam Revu
- Adobe Acrobat
- Excel
- PDFs and scans
- Public databases
- Miami-Dade NOAs
- Florida Product Approval
The workstreams
Three uses, one review grid
The same foundation serves all three: an approval is read only once, then reused for every opening and every project.
Windows and doors
Windows, doors, sliding glass doors and curtain walls are checked opening by opening. Each line cites the page of the approval.
In practice: A residential tower receives the submittal for its sliding glass doors. Hibiscus flags the corner openings whose design pressure exceeds what the approval allows for their size.
Roofing
Membranes, insulation and fasteners are compared with the roof system's approval. Perimeter and corner zones are read separately.
In practice: A roofing submittal cites a valid approval, but for a different deck than the one specified. Hibiscus raises it as a question for the supplier.
Validity
Approval expiration dates and revisions are tracked, submittal by submittal. A superseded approval is read again.
In practice: The approval cited by a door supplier has been superseded by a revision. Hibiscus flags it at the submittal stage, so your team can ask for the current version.
The ground rules
A copilot, not an autopilot
What Hibiscus will never do
- Approve or reject a submittal: the review commits your team and the engineer.
- Compare pressures by guesswork: the comparison is done by calculation.
- Assume an approval covers a product: without the right configuration, it's a question.
- Sign, seal or send a document to the building department.
- Write to the supplier on your behalf.
- Calculate wind pressures: that's the structural engineer's job.
The limits: Hibiscus doesn't post any review in your project platform without approval, and sends nothing to a supplier.
What's always true
- Hosted in the US
- Your submittals stay in a US region of the cloud provider you choose, or in your own account.
- Mistral by default
- The default model is Mistral, deployed in the same region, and your documents are never used to train a third-party model.
- Calculation compares
- The model reads, a program compares the pressures, a person decides.
- The page, cited
- Each line of the grid points to the page and table of the approval, so you can check it at a glance.
What it costs
Lease Hibiscus, or buy it
Lease Hibiscus
from $1,500 a month
- Setup
- $7,500 to $22,500 2 to 4 weeks with a first tool connected: the agent is configured on your documents, your rules and that tool, then tested with your team. Each additional tool adds one to two weeks.
- Monthly fee
- $1,500 to $4,500 a month Depending on the volume handled and the number of tools connected. For multiple locations or companies, the amount is set in the quote after our first meeting. 24-month commitment, then one month's notice.
Hosting, supervision, updates and adjustments included.
Or buy it, fully custom
- Scoping
- $2,500 to $6,000 1 to 2 weeks, on your real documents: what the agent will do, the hours it will save you, the quote for the pilot.
- Pilot
- $12,000 to $30,000 6 to 10 weeks, on one task and one team or site. The time saved is measured, and you can stop at the end.
- Rollout
- $25,000 to $70,000 Depending on the number of sites and software tools to connect.
- Running the agent
- $500 to $2,500 a month Hosting, model, monitoring and small improvements.
Indicative ranges in US dollars, for clients in the United States: a senior team with Paris-based pricing. The price is fixed in a quote after our first meeting or the scoping phase; clients in Europe are quoted in euros.
How we start
- 01
One hour
Together, we look at a window and door submittal and the engineer's pressure table, with no commitment.
- 02
A submittal already reviewed
Hibiscus works on a submittal whose errors you know, to see what the agent catches and what it misses.
- 03
One connector
One to two weeks to read submittals in your project platform, read-only.
- 04
A project in parallel
On the next submittals, your team checks as usual and compares, then you decide.
FAQ
What people ask us first
How long does it take to set up Hibiscus?
One hour to look at a window and door submittal and the pressure table, then a submittal already reviewed to compare with your team. The connector to your project platform takes one to two weeks to set up, read-only. The trial in parallel then runs on your next submittals, and you decide.
What is an NOA?
It is the product approval issued by Miami-Dade County (Notice of Acceptance). For a tested product, it sets the sizes, rated pressures, impact resistance and anchorage. In the High-Velocity Hurricane Zone, an exterior window or door must have one, or a state approval valid in that zone.
Does Hibiscus replace the architect's or engineer's review?
No. Hibiscus prepares the review grid and flags discrepancies. The review of the submittal stays with your team, the engineer and the architect.
How are the pressures compared?
By calculation, not by AI. The model reads the tables and pulls the values, with their page. A program then compares each required pressure with the rated pressure. An unreadable value becomes a question, never an assumption.
Do we need to change our project platform?
No. Hibiscus reads submittals where they already arrive: Procore, Autodesk Construction Cloud or your shared folders. Your review workflow stays the same.
Where are our documents hosted?
In a US region of the cloud provider you choose, or in your own account. The default model is Mistral, deployed in the same region. Your documents are never used to train a third-party model.
How much time does Hibiscus save?
We estimate 25 hours a month, for 2 projects in the submittal phase. This is Rodium's estimate, based on the time this review takes in the industry. The submittal already reviewed measures yours.
You're in Paris: how do we work together?
Directly with our developers, in English, with no middlemen. Our afternoons in Paris are your mornings in Florida: video calls are scheduled in that shared window. The contract is drafted in English or French.