Explore in 3D Start a projectGet started

AI agent: Finance and accounting

Freesia

An agent for general contractors building in Florida. Freesia matches each Notice to Owner with the lien waivers received at every payment, and keeps the list behind the final affidavit; your team pays, drafts and signs.

Lease from $1,500 a month ≈ 12 hours saved a month

Notices to Owner arrive by mail, lien waivers through the platform, and nothing connects them.

  • Liens and waivers
  • Before every payment
  • Your team pays

Lease this agent Book a meeting

Estimate for a project with 40 subcontractors

Agent identity cardFront

Portrait of Freesia
Agent name
FREESIA
Role
Finance and accounting
Industry
Construction
Country
United States
Built by
Rodium, Paris

No. AGT-030-FIN · Rodium agent library

Skills

  • Notice log
  • Payment cycle
  • Project closeout

Authorizations

  • ReadAllowed
  • ReconcileAllowed
  • FlagAllowed
  • PayReserved for your team
  • AttestReserved for your team

Motto I prepare, you decide.

Agent identity cardBack

What Freesia will never do

  • Trigger, withhold or cancel a payment
  • Draft or sign the final affidavit for you: it is signed under oath
  • Record, contest or release a lien
  • Write to a subcontractor or a supplier without review

Who does what

Read
Freesia
Reconcile
Freesia
Flag
Freesia
Pay
Your team
Attest
Your team

Freesia in four numbers

≈ 12 h

hours saved a month

Estimate for a project with 40 subcontractors

2 of 5

steps stay with you

Pay · Attest

5

sources read for you

Notices to Owner · Lien waivers · Pay applications · Accounting · Contracts

$1,500

a month, leased over 24 months

The flow

What Freesia reads, and what comes out

Your sources

  • Notices to Ownernotices received
  • Lien waiverspartial and final, signed
  • Pay applicationsthis month's payment requests
  • Accountingpayments issued, by company
  • Contractssubcontractors and suppliers
Freesiareading, matching, flagging

What comes out

  • Notice logby company and by trade
  • Missing waiversbefore the next payment
  • Discrepanciesamount, period, signature
  • List for the affidavitwho is still owed
  • Logdocument by document

No payment and no affidavit without your team.

The problem

The risk of paying twice

In Florida, an unpaid company can record a lien on the property. Suppliers and subcontractors with no direct contract with the owner protect that right with a notice, the Notice to Owner. Before each payment, every notice received has to be matched with the lien waiver that covers that payment.

  • By certified mail.

    Notices arrive on paper

    They get scanned, filed, sometimes forgotten on a desk. The list of them is never quite up to date.

  • Amount, period, signature.

    Every waiver needs checking

    It has to cover the right payment, through the right date, signed by the right company. One wrong period is enough to leave a gap.

  • The subcontractor's supplier.

    Second-tier parties slip through

    A supplier sent its notice, but nobody asked it for a waiver. The payment goes out anyway.

  • Under oath.

    The final affidavit is binding

    At the end of the project, the general contractor swears under oath who is still owed. The list then has to be rebuilt by hand, across the whole project.

TodayBy hand

  1. You scan incoming notices and file them in a folder.
  2. You compare waivers with payments in a spreadsheet.
  3. You check amount, period and signature by eye.
  4. The second-tier supplier gets forgotten.
  5. The list for the final affidavit is redone at the end.

With FreesiaPayment stays yours

  1. Every notice is read and logged as soon as it arrives.
  2. Waivers are matched to payments by calculation.
  3. Amount, period and signature are checked, and any discrepancy flagged.
  4. Every second-tier notice calls for its waiver.
  5. The affidavit list is kept up to date throughout the project.

How it works

Five steps to the affidavit, two of them yours

Read, match and flag: Freesia. Pay and attest: your team, the only one that can bind the company.

  1. 01Freesia

    Read

    Freesia reads every notice received, scans included: who sends it, for which subcontractor, on which project, on what date. The notice is entered in the project's log.

  2. 02Freesia

    Reconcile

    With every pay application, the waivers received are matched to the payments and notices. Amounts come from the documents, and the matching is done by calculation.

  3. 03Freesia

    Flag

    Before payment, the list of missing or defective waivers is ready, company by company, with the follow-up drafted.

  4. 04Your team

    Pay

    Your team decides to pay, to hold back or to request the document. Freesia pays nothing and blocks nothing.

  5. 05Your team

    Attest

    At the end of the project, the list of companies still owed feeds your affidavit. Your team drafts it and signs it under oath.

What Freesia connects to

Payments and waivers
  • Procore Pay
  • Levelset
  • Oracle Textura
  • GCPay
Construction accounting
  • Sage 300 CRE
  • Viewpoint Vista
  • CMiC
  • Foundation
  • QuickBooks
Documents and email
  • Procore
  • Microsoft 365
  • Outlook
  • Google Workspace
  • PDFs and scans

The workstreams

Three uses, one log

The same foundation serves all three: a notice is read only once, then tracked through to the last waiver.

  • Notice log

    Each Notice to Owner is read and logged on receipt, scans included. The log shows who has lien rights, and through which subcontractor.

    In practice: A rebar supplier sends its notice through the concrete subcontractor. Freesia adds it to the log, and its waiver joins the documents expected for that trade package.

  • Payment cycle

    Before each payment, the waivers received are compared with the notices and the amounts. Anything missing is listed, with the follow-up ready.

    In practice: An electrician's waiver covers the previous month, not the current payment. Freesia flags the period mismatch before your team releases the payment.

  • Project closeout

    The list of companies still owed is kept throughout the project. At the end, it is ready for your affidavit.

    In practice: At closeout, several suppliers have not turned in their final waivers. Freesia lists them with their notices and payments; your team still drafts and signs the affidavit.

The ground rules

A copilot, not an autopilot

What Freesia will never do

  • Trigger, withhold or cancel a payment.
  • Draft or sign the final affidavit for you: it is signed under oath.
  • Record, contest or release a lien.
  • Write to a subcontractor or a supplier without review.
  • Give legal advice: lien law stays your attorney's job.

The limits: Freesia never writes to your accounting or your payment platform without written consent, and never triggers a payment.

What's always true

Hosted in the US
Your financial data stays in a US region of the cloud provider you choose, or in your own account.
Mistral by default
The default model is Mistral, deployed in the same region, and your documents are never used to train a third-party model.
Amounts come from the documents
No amount is ever made up: every match is done by calculation, never by AI.
Traceability
Every notice, waiver and approval is logged, with its date and source.

What it costs

Lease Freesia, or buy it

Lease Freesia

from $1,500 a month

Setup
$7,500 to $22,500 2 to 4 weeks with a first tool connected: the agent is configured on your documents, your rules and that tool, then tested with your team. Each additional tool adds one to two weeks.
Monthly fee
$1,500 to $4,500 a month Depending on the volume handled and the number of tools connected. For multiple locations or companies, the amount is set in the quote after our first meeting. 24-month commitment, then one month's notice.

Hosting, supervision, updates and adjustments included.

Lease this agent

Or buy it, fully custom

Scoping
$2,500 to $6,000 1 to 2 weeks, on your real documents: what the agent will do, the hours it will save you, the quote for the pilot.
Pilot
$12,000 to $30,000 6 to 10 weeks, on one task and one team or site. The time saved is measured, and you can stop at the end.
Rollout
$25,000 to $70,000 Depending on the number of sites and software tools to connect.
Running the agent
$500 to $2,500 a month Hosting, model, monitoring and small improvements.

Indicative ranges in US dollars, for clients in the United States: a senior team with Paris-based pricing. The price is fixed in a quote after our first meeting or the scoping phase; clients in Europe are quoted in euros.

How we start

  1. 01

    One hour

    Together, we look at your notices, your waivers and one payment cycle, with no commitment.

  2. 02

    A closed project

    Freesia works on the documents from a completed project, then you compare her log with yours.

  3. 03

    One connector

    One to two weeks to connect to your payment platform and your accounting, read-only.

  4. 04

    A cycle in parallel

    At the next payment, your team checks as usual and compares, then you decide.

FAQ

What people ask us first

How long does it take to set up Freesia?

One hour to look at your notices, your waivers and one payment cycle, then a closed project to compare her log with yours. The connector to your payment platform and your accounting takes one to two weeks to set up, read-only. The cycle in parallel then runs on your next payment, and you decide.

What is a Notice to Owner?

It is the notice by which a supplier or subcontractor with no direct contract with the owner preserves its lien rights. It must be sent within a deadline set by Florida law. Paying without the matching waiver means risking paying twice.

Does Freesia replace our lien waiver platform?

No. Your platform collects the waivers. Freesia matches them to the notices and payments, including notices that arrived by mail, and flags what is missing.

Does Freesia prepare the final affidavit?

Freesia keeps the list behind it: each company, its notices, its payments, its waivers. The affidavit is signed under oath. Your team still drafts, checks and signs it.

Who decides to pay?

Your team, always. Freesia flags a missing waiver, without blocking or releasing any payment.

Where is our data hosted?

In a US region of the cloud provider you choose, or in your own account. The default model is Mistral, deployed in the same region. Your documents are never used to train a third-party model.

How much time does Freesia save?

We estimate 12 hours a month, for a project with 40 subcontractors. This is Rodium's estimate, based on the time this matching takes in the industry. The closed project measures yours.

You're in Paris: how do we work together?

Directly with our developers, in English, with no middlemen. Our afternoons in Paris are your mornings in Florida: video calls are scheduled in that shared window. The contract is drafted in English or French.